Sprint backlog table

The bottom panel of the Sprints view. Every task in the active sprint, grouped by board status (Done · In Review · In Progress · Not Started · Backlog), with CP flags on critical-path tasks and owner avatar chips.

Step 6 (Execute) of the hybrid PM flow — the table Tom and Maya scan during standup; the table Raj never opens but whose contents drive his Gantt re-forecast.

  • Section headerSPRINT BACKLOG · {N} tasks · grouped by board status · {N} pts committed
  • Group headersDone, In Review, In Progress, Not Started, Backlog — collapsible, state persists in sessionStorage
  • Per-row columns — short id, name, points, CP flag (semantic-critical outlined), owner avatars, board status chip
  • c to add task keyboard hint — opens the create-task modal pre-targeted at the active (or planned) sprint. Rebound from ⌘K, which is reserved for the global command palette
  • Open in board link — navigates to /projects/:id/board?sprint=:sprintId
  • Pull from backlog → button (planned sprints only) — while a sprint is still being planned, this opens the story picker in place: a multi-select list of the project’s backlog stories, with the sprint’s capacity preflight and committed-points readout staying live as stories are selected. An empty planned sprint surfaces it as the primary call-to-action, so a freshly created sprint points the team at where work is pulled in rather than showing a dead-end empty table.

Opens as a dialog over the Sprints page. Every backlog story shows its points and Definition of Ready state:

  • Ready only (default) — the picker’s starting view, so a story missing an estimate or an unmet acceptance criterion is not offered by default. A count (“N not-ready stories are hidden”) plus a Show all toggle always reveals the rest — sorted ready-first, dimmed, with the specific reason each is blocked (needs an estimate, add at least one acceptance criterion, all acceptance criteria must be met) — so a story is never silently absent.
  • Selecting a not-ready story is never blocked. It surfaces an inline advisory note (“N selected stories are not marked Ready — you can still pull them into the sprint”) and the commit button stays enabled — the same advisory-only READY gate every other backlog surface uses.
  • Commit applies to every selected story in one action (PATCH each story’s sprint), closing the picker on success. The default “Ready only” starting filter is a per-project, per-program, or per-workspace setting (General → Sprint planning, inherited workspace → program → project) — overridable per session in the picker regardless of the configured default.
  • Route: /projects/:projectId/sprints (below the timeline strip)
MethodEndpointPurpose
GET/api/v1/tasks/?project={pid}&sprint={sid}Sprint-filtered task list

The sprint=none filter returns the project backlog (sprint-less tasks).

Why the order is reverse-flow (Done first)

Section titled “Why the order is reverse-flow (Done first)”

Reads right-to-left through the board flow — the team’s most recent wins are top of the panel, the not-yet-started work is at the bottom. Mirrors how a Scrum Master reviews progress at standup (“what shipped, what’s in flight, what’s next”).

  • ADR-0037 — Sprint task FK + story_points + filtering
  • ADR-0039 — Board column config (used for status chip colors)
  • Tom (engineer) — the rows assigned to you with CP flags are the work that delays the project end date. Treat them first.
  • Maya — collapse Done at standup so the active rows dominate the screen.